Printable PagePrintable Page Email This PageEmail This Page

Salvage Repair of an Aluminum Anti-Ice Shield Assembly for the Aerospace Industry

Anti-ice shield assemblies protect aerospace engines from the ravages of ice buildup. One of Component Repair Management’s customers contacted them to perform salvage repairs of aluminum anti-ice shield assemblies to original specifications so they could continue in service. These 6061 aluminum assemblies required replacement of their fitting blocks, back plates, and feet, all of which Component Repair accomplished by applying their welding, blending, and metal fabrication skills. The aluminum anti-ice shield assemblies also received heat treatment and abrasive blasting to bring them to their as-formed state, and required no additional finish. Customer specifications as well as the Garrett Engine maintenance manual required all the work to be performed to tight tolerances of ± 0.020". Fluorescent penetrants were used to perform final inspections, a simple and cost-effective way of eliminating defects from critical aerospace components. Component Repair performs salvage repairs on 30 to 60 of these aluminum anti-ice shield assemblies per month and delivers them directly to the customer’s dock.

Component Repair Management has been salvaging and repairing all kinds of aerospace components and parts for over 15 years, quickly returning them to service to maximize your operations while minimizing your expenses. Contact us today for further information.

Anti-Ice Shield Assembly
Anti-Ice Shield Assembly
Repair for Anti-Ice Shield Assembly
Repair for Anti-Ice Shield Assembly
Request a Quote

Aluminum Anti-Ice Shield Assembly Project Highlights

Project Scope
Salvage repair of the anti-ice shield assembly
Capabilities Applied/Processes
Primary:
Welding
Blending
Metal Fabrication

Secondary:
Heat Treating
Abrasive Blasting
Tightest Tolerances
± 0.020"
Material Used
6061 Aluminum
Material Finish
As Formed, No Coating
Special Features
Replacement of Fitting Blocks, Back Plates, and Feet
In process testing/inspection performed
Fluorescent Penetrant Inspection
Industry for Use
Aerospace
Volume
30 – 60 per Month
Delivery/Turnaround Time
2 – 3 Weeks
Delivery Location
Customer Dock
Standards Met
Customer Specifications, Garrett Engine Maintenance Manual
Product Name
Anti-Ice Shield Assembly
View Other Past Projects
© 2013 Component Repair Management, Inc., All Rights Reserved Site created by Thomas Web Solutions