Our Services
Process Hand Blending
Equipment Tungsten Carbide Burrs
Aluminum Oxide Mounted Stones
Aluminum Oxide Belts
Restores Part Configuration
Dimensions
Shape
Contours
Material Cobalt Super Alloys
Nickel Super Alloys
Aluminum
Titanium
Length 4" to 18"
Width 3" to 14"
Height 2" to 12"
Cleaning Hydrogen Fluoride Ion Cleaning
Finish No. 4.1 Grit Blasting
Finish No. 4.2 Hot Alkaline Cleaning
Finish No. 4.3 Solvent Cleaning
Blending Procedures (GE Standard Practices Manual 70-42-00)
Light Duty Alkaline Cleaning (GE Standard Practices Manual 70-32-03)
Finishing Vibratory Deburring
Heat Treatment
Coatings
Inspection Coordinate Measuring Machine (CMM)
Fluorescent Penetrant Inspection (FPI)
SAE-AMS-STD-2175
Method 5.3.1 (Visual)
Method 5.3.2.2 (Penetrant)
ASQ-21.4 & ASQ – Z1.9
ISO-10012 & ANSI Z540.3
Spot Fluorescent Penetrant Inspection (GE 70-32-03)
Welding
Testing Certified Level II NDT Liquid Penetrant
Non Destructive Testing (Mil-HNBK-728/1)
Quality Program FAA 14 CFR Part 145 Compliance
Documentation FAA Form 8130-3 (Airworthiness Approval Tag)
Additional Services Repair Process Development
Designated Engineering Representative (DER)
Production Volume 1 to 30 parts
Typical Lead Time 2 to 4 weeks

 

Industry Focus Aerospace
Military
Commercial
Intended Applications Turbine Components
Non-Rotating Vanes
Vane Rings
Nozzles
Ducts
Seals
Related Non-Rotating Assemblies
Air Agency Certification Federal Aviation Administration (FAA R91R0970)
European Aviation Safety Agency (EASA.145.5316)
File Formats Modeling Capabilities